Available Study Reports
To apply for access to reports you must complete the CEII and Non-disclosure Agreement and follow the instructions included in the form.

The following is a list of available study reports:

Assessment Studies

  1. VACAR 2006 Stability Study for 2010 (March 2007)
  2. P6-9 VACAR 2011 Summer Peak Reliability Study (April 2007)
  3. 6-11 SERC LTSG 2011 Summer Study (December 2007)
  4. 2013 Summer/Winter VACAR Study (June 2008)
  5. SERC LTSG 2019 Summer Study (March 2009)
  6. VACAR 2015 Summer Peak Reliability Study (April 2009)
  7. VACAR Stability Study of Projected 2014-2015 Winter (April 2009)
  8. 2014 Summer SERC East-RFC Interregional Study (November 2009)
  9. SERC LTSG 2015 Summer Study (December 2009)
  10. VACAR 2015 Summer Study (August 2010)
  11. SERC LTSG 2016 Summer Study (December 2010)
  12. CTPCA 2014/21 Summer Peak Reliability Study (April 2011)
  13. CTPCA 2015/18 Summer Peak Reliability Study (October 2011)

Economic Planning Studies

  1. Scenario: 600 MW Transfer from SCE&G to Duke (March, 2009)
  2. Scenario: 600 MW Transfer from Santee Cooper to Progress Energy Carolinas (March, 2009)
  3. Scenario: 1200 MW Transfer from SCE&G to Duke (March, 2009)
  4. Scenario: 500 MW Transfer from SCE&G to Southern, 2020 (March 2010)
  5. Scenario: 500 MW Transfer from SCE&G to Progress Energy Carolinas, 2015 (March 2010)
  6. Scenario: 500 MW Transfer from SCE&G to Progress Energy Carolinas, 2020 (March 2010)
  7. Scenario: 500 MW Transfer from SCE&G to Duke, 2015 (March 2010)
  8. Scenario: 500 MW Transfer from SCE&G to Duke, 2020 (March 2010)
  9. Scenario: 500 MW Transfer from SCPSA to Progress Energy Carolinas, 2015 Summer (July 2011)
  10. Scenario: 500 MW Transfer from SCPSA to Duke, 2015 Summer (July 2011)
  11. Scenario: 200 MW Transfer from SCPSA to Southern Company, 2015 Summer (July 2011)
  12. Scenario: 1000 MW Transfer from SCRTP (Coast) to Southern Company and PJM, 2020 Summer (July 2011)